Count all items on reception of the delivery to confirm its
completeness. Before you begin this task, you need to apply some safety
measures to avoid harm by heavy objects.
IEC 61400-4:2012
Make sure to have enough free space available to safely remove the
panels, and other packaging materials of the crates, from the turbine hardware.
Handlers must have obtained a safety certificate or
minimum level
Safety Certificate 'basic', or VCA-attest 'basis'
Minimum 2 handlers and 1 supervisor
Mechanic
Crane handler; or lift
operator
10 - 20 minutes
Minimum 3 safety cables (Lifting load > 3000 kg),
Minimum 3 fixation points, or security anchors
Lifting materials with electro motor,
Checklist, e.g. printout of the
list of "Components of a wind
turbine"
1 pen
2 spare safety
cables
Warning
Heavy
objects! Moving objects due to gravity!
Crushing or
trapping of body parts, or impact injuries
Fasten
the gearbox chassis securely
before moving the crate parts
Attach
least 4 cables to the chassis of the gearbox before unpacking
Use lifting aids.
Work only on a dry and clean floor, where all unnecessary objects are
removed.
The supervisor has made arrangements to keep
other personnel at least 10 meters away from the crates and the hardware.
(tape, boards, signs ...)
Checking the
delivered items.
Does the delivery contain 1 gearbox (nr. 10 on the list) ?
If there is a gearbox, go to the next step.
Foundation with underground structures
Transformer station
Tower
Access ladder
Wind orientation control & Yaw system
Nose cone
Generator
Instruments as anemometer, weather devices
Rotor break, drive chain break
Gearbox (nr. 10)
3 Rotor blades
Blade pitch control
Rotor hub
Check the image "Components of a wind turbine" to help you to identify the correct components.
There should be 3 blades available.
In case you have
received 3 blades (nr. 11), this is normal.
In case you have received less than 3 blades, send us an email.
All building blocks for the wind turbine are now at your
disposal. You can go to the next step.